{"id":128687,"date":"2020-06-20T01:55:50","date_gmt":"2020-06-19T20:25:50","guid":{"rendered":"https:\/\/arunachaltimes.in\/?p=128687"},"modified":"2020-06-20T01:55:50","modified_gmt":"2020-06-19T20:25:50","slug":"unit-of-600-mw-kameng-hep-commissioned","status":"publish","type":"post","link":"https:\/\/arunachaltimes.in\/index.php\/2020\/06\/20\/unit-of-600-mw-kameng-hep-commissioned\/","title":{"rendered":"Unit of 600 mw Kameng HEP commissioned"},"content":{"rendered":"<p style=\"text-align: justify;\"><strong>ITANAGAR, Jun 19:<\/strong> A 150 mw unit of the 600 mw Kameng Hydroelectric Project (HEP) was commissioned for commercial operation by the North Eastern Electric Power Corporation (NEEPCO) Ltd on 17 June.<br \/>\n<a href=\"https:\/\/arunachaltimes.in\/wp-content\/uploads\/2020\/06\/Kameng-HEP.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-128690 alignleft\" src=\"https:\/\/arunachaltimes.in\/wp-content\/uploads\/2020\/06\/Kameng-HEP.jpg\" alt=\"\" width=\"340\" height=\"255\" srcset=\"https:\/\/arunachaltimes.in\/wp-content\/uploads\/2020\/06\/Kameng-HEP.jpg 340w, https:\/\/arunachaltimes.in\/wp-content\/uploads\/2020\/06\/Kameng-HEP-300x225.jpg 300w, https:\/\/arunachaltimes.in\/wp-content\/uploads\/2020\/06\/Kameng-HEP-80x60.jpg 80w, https:\/\/arunachaltimes.in\/wp-content\/uploads\/2020\/06\/Kameng-HEP-265x198.jpg 265w\" sizes=\"auto, (max-width: 340px) 100vw, 340px\" \/><\/a>From the unit, Arunachal will get 13.83 percent, of which 12 percent will be free, and the remaining 1.83 percent will be on share allocation.<br \/>\nThis was informed to Deputy Chief Minister Chowna Mein, who is also the power &amp; renewable energy resources minister.<br \/>\nThe second unit is expected to be commissioned in a week&#8217;s time. The other two turbines will be commissioned after repair work on the penstock is completed, and are targeted to be made commercially operational within this fiscal year.<br \/>\nAfter the commissioning of all four units of the HEP, Arunachal will receive a share of 83 mw.<br \/>\n&#8220;Apart from revenue generation, this hydel project will provide employment opportunities to the educated youths of the state and promote industrialization in the region,&#8221; said the DCM. (DCM&#8217;s PR Cell)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>ITANAGAR, Jun 19: A 150 mw unit of the 600 mw Kameng Hydroelectric Project (HEP) was commissioned for commercial operation by the North Eastern Electric Power Corporation (NEEPCO) Ltd on 17 June. From the unit, Arunachal will get 13.83 percent, of which 12 percent will be free, and the remaining 1.83 percent will be on [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[],"class_list":{"0":"post-128687","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-state-news"},"_links":{"self":[{"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/posts\/128687","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/comments?post=128687"}],"version-history":[{"count":0,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/posts\/128687\/revisions"}],"wp:attachment":[{"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/media?parent=128687"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/categories?post=128687"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/tags?post=128687"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}