{"id":131209,"date":"2020-07-11T04:13:56","date_gmt":"2020-07-10T22:43:56","guid":{"rendered":"https:\/\/arunachaltimes.in\/?p=131209"},"modified":"2020-07-11T04:13:56","modified_gmt":"2020-07-10T22:43:56","slug":"orgs-blame-lack-of-drainage-system-for-floods-in-namsai","status":"publish","type":"post","link":"https:\/\/arunachaltimes.in\/index.php\/2020\/07\/11\/orgs-blame-lack-of-drainage-system-for-floods-in-namsai\/","title":{"rendered":"Orgs blame lack of drainage system for floods in Namsai"},"content":{"rendered":"<p style=\"text-align: justify;\"><strong><a href=\"https:\/\/arunachaltimes.in\/wp-content\/uploads\/2020\/07\/Orgs-blame-lack-of-drainage-system-for-floods-in-Namsai.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-131211 alignleft\" src=\"https:\/\/arunachaltimes.in\/wp-content\/uploads\/2020\/07\/Orgs-blame-lack-of-drainage-system-for-floods-in-Namsai.jpg\" alt=\"\" width=\"472\" height=\"266\" srcset=\"https:\/\/arunachaltimes.in\/wp-content\/uploads\/2020\/07\/Orgs-blame-lack-of-drainage-system-for-floods-in-Namsai.jpg 472w, https:\/\/arunachaltimes.in\/wp-content\/uploads\/2020\/07\/Orgs-blame-lack-of-drainage-system-for-floods-in-Namsai-300x169.jpg 300w\" sizes=\"auto, (max-width: 472px) 100vw, 472px\" \/><\/a>[ Pisi Zauing ]<\/strong><br \/>\n<strong>NAMSAI, Jul 10:<\/strong> The All Tai-Khampti Singpho Students&#8217; Union and the All Namsai District Students&#8217; Union have blamed the absence of a proper drainage system for the flooding of the township area here.<br \/>\nIn a joint representation to the Namsai DC, the organizations alleged misappropriation of state- and centrally-sponsored funds meant for the development of Namsai town by the department concerned.<br \/>\nThey alleged that the assistant engineer of the UD&amp;H department was also working as a contractor under his own department.<br \/>\nThe student organizations claimed that huge funds meant for construction of a drainage system and management of solid waste in Namsai town were released by the government. They said while work for construction of a barrack for sanitation assistants in Namsai is yet to start, &#8220;it is complete on paper.&#8221;<br \/>\n&#8220;The truck under UD&amp;H department meant for collection of wastes from the township is nowhere to be seen since months,&#8221; the representation read.<br \/>\nThe organizations also demanded immediate removal of the structures in Namsai town which they said are being constructed by trespassing on the public&#8217;s right of way, and immediate clearance of the clogged drains on both sides of the roads in the township.<br \/>\nThe organizations have given the administration two weeks to fulfill their demands.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ Pisi Zauing ] NAMSAI, Jul 10: The All Tai-Khampti Singpho Students&#8217; Union and the All Namsai District Students&#8217; Union have blamed the absence of a proper drainage system for the flooding of the township area here. In a joint representation to the Namsai DC, the organizations alleged misappropriation of state- and centrally-sponsored funds meant [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[],"class_list":{"0":"post-131209","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-state-news"},"_links":{"self":[{"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/posts\/131209","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/comments?post=131209"}],"version-history":[{"count":0,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/posts\/131209\/revisions"}],"wp:attachment":[{"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/media?parent=131209"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/categories?post=131209"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/tags?post=131209"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}