{"id":137064,"date":"2020-09-11T01:01:29","date_gmt":"2020-09-10T19:31:29","guid":{"rendered":"https:\/\/arunachaltimes.in\/?p=137064"},"modified":"2020-09-11T01:01:29","modified_gmt":"2020-09-10T19:31:29","slug":"work-on-nh-415-packages-begins","status":"publish","type":"post","link":"https:\/\/arunachaltimes.in\/index.php\/2020\/09\/11\/work-on-nh-415-packages-begins\/","title":{"rendered":"Work on NH 415 packages begins"},"content":{"rendered":"<p style=\"text-align: justify;\"><strong>ITANAGAR, Sep 10:<\/strong> Work for the construction of Packages B and C of NH 415, from Papu Nallah to Banderdewa, commenced on Thursday with the identification of the assets falling within the right of way (RoW) and the proposed RoW by a committee headed by Naharlagun EAC Likha Radh.<\/p>\n<p style=\"text-align: justify;\"><a href=\"https:\/\/arunachaltimes.in\/wp-content\/uploads\/2020\/09\/Work-on-NH-415-packages.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-137068 alignleft\" src=\"https:\/\/arunachaltimes.in\/wp-content\/uploads\/2020\/09\/Work-on-NH-415-packages.jpg\" alt=\"\" width=\"312\" height=\"138\" srcset=\"https:\/\/arunachaltimes.in\/wp-content\/uploads\/2020\/09\/Work-on-NH-415-packages.jpg 312w, https:\/\/arunachaltimes.in\/wp-content\/uploads\/2020\/09\/Work-on-NH-415-packages-300x133.jpg 300w\" sizes=\"auto, (max-width: 312px) 100vw, 312px\" \/><\/a>The committee started its work at the Banderdewa check gate on Thursday.<\/p>\n<p style=\"text-align: justify;\">The EAC informed that &#8220;identification is being carried out for the list of structures for demolition, and there shall be no fresh assessment for compensation.&#8221;<\/p>\n<p style=\"text-align: justify;\">Meanwhile, ICR DC Komkar Dulom has urged the people to cooperate with the administration to ensure that the identification process is carried out smoothly. (DIPRO)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>ITANAGAR, Sep 10: Work for the construction of Packages B and C of NH 415, from Papu Nallah to Banderdewa, commenced on Thursday with the identification of the assets falling within the right of way (RoW) and the proposed RoW by a committee headed by Naharlagun EAC Likha Radh. The committee started its work at [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[],"class_list":{"0":"post-137064","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-state-news"},"_links":{"self":[{"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/posts\/137064","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/comments?post=137064"}],"version-history":[{"count":0,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/posts\/137064\/revisions"}],"wp:attachment":[{"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/media?parent=137064"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/categories?post=137064"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/tags?post=137064"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}