{"id":140732,"date":"2020-10-29T01:30:22","date_gmt":"2020-10-28T20:00:22","guid":{"rendered":"https:\/\/arunachaltimes.in\/?p=140732"},"modified":"2020-10-29T01:30:22","modified_gmt":"2020-10-28T20:00:22","slug":"dakpe-flags-off-tah-construction-at-pha-koro","status":"publish","type":"post","link":"https:\/\/arunachaltimes.in\/index.php\/2020\/10\/29\/dakpe-flags-off-tah-construction-at-pha-koro\/","title":{"rendered":"Dakpe flags-off TAH construction at Pha Koro"},"content":{"rendered":"<p style=\"text-align: justify;\"><strong><a href=\"https:\/\/arunachaltimes.in\/wp-content\/uploads\/2020\/10\/Dakpe-flags-off-TAH-construction-at-Pha-Koro.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-140757 alignleft\" src=\"https:\/\/arunachaltimes.in\/wp-content\/uploads\/2020\/10\/Dakpe-flags-off-TAH-construction-at-Pha-Koro.jpg\" alt=\"\" width=\"429\" height=\"322\" srcset=\"https:\/\/arunachaltimes.in\/wp-content\/uploads\/2020\/10\/Dakpe-flags-off-TAH-construction-at-Pha-Koro.jpg 591w, https:\/\/arunachaltimes.in\/wp-content\/uploads\/2020\/10\/Dakpe-flags-off-TAH-construction-at-Pha-Koro-300x225.jpg 300w, https:\/\/arunachaltimes.in\/wp-content\/uploads\/2020\/10\/Dakpe-flags-off-TAH-construction-at-Pha-Koro-559x420.jpg 559w, https:\/\/arunachaltimes.in\/wp-content\/uploads\/2020\/10\/Dakpe-flags-off-TAH-construction-at-Pha-Koro-80x60.jpg 80w, https:\/\/arunachaltimes.in\/wp-content\/uploads\/2020\/10\/Dakpe-flags-off-TAH-construction-at-Pha-Koro-265x198.jpg 265w\" sizes=\"auto, (max-width: 429px) 100vw, 429px\" \/><\/a>RAGA, Oct 28:<\/strong> The construction for package 4 of the Trans-Arunachal Highway (TAH) in Kamle district was flagged-off by MLA Tarin Dakpe at Pha Koro, around 6 kms from here, on Wednesday.<\/p>\n<p style=\"text-align: justify;\">Assistant Engineer Hage Tachang informed that packages 3, 4 and 5 span over a length of 128.7 kms.<\/p>\n<p style=\"text-align: justify;\">&#8220;Package 4, which was inaugurated today (from Pha Koro to Belak Muri), is 46.030 kms in length,&#8221; he said.<\/p>\n<p style=\"text-align: justify;\">M\/s Amar Infra Ltd is the concessionaire of this stretch of the TAH.<\/p>\n<p style=\"text-align: justify;\">Khoda Gyati, the managing director of M\/s Amar Infra Ltd assured to recruit local youths in various capacities. He also requested the DLRSO to mark the disposal area.<\/p>\n<p style=\"text-align: justify;\">Deputy Commissioner Hengo Basar informed that the concessionaire will start its work in the forest land with immediate effect.<\/p>\n<p style=\"text-align: justify;\">Terming the day as historic, the MLA exhorted all the stakeholders to extend cooperation to the concessionaire and the district administration to facilitate completion of the project within a stipulated time period.<\/p>\n<p style=\"text-align: justify;\">Later, bhumi pujan was performed for peaceful and successful construction of the TAH. (DIPRO)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>RAGA, Oct 28: The construction for package 4 of the Trans-Arunachal Highway (TAH) in Kamle district was flagged-off by MLA Tarin Dakpe at Pha Koro, around 6 kms from here, on Wednesday. Assistant Engineer Hage Tachang informed that packages 3, 4 and 5 span over a length of 128.7 kms. &#8220;Package 4, which was inaugurated [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[],"class_list":{"0":"post-140732","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-state-news"},"_links":{"self":[{"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/posts\/140732","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/comments?post=140732"}],"version-history":[{"count":0,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/posts\/140732\/revisions"}],"wp:attachment":[{"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/media?parent=140732"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/categories?post=140732"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/tags?post=140732"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}