{"id":140748,"date":"2020-10-29T01:29:01","date_gmt":"2020-10-28T19:59:01","guid":{"rendered":"https:\/\/arunachaltimes.in\/?p=140748"},"modified":"2020-10-29T01:29:01","modified_gmt":"2020-10-28T19:59:01","slug":"abkyw-seeks-clearance-of-all-block-points-on-pasighat-pangin-road-within-15-days","status":"publish","type":"post","link":"https:\/\/arunachaltimes.in\/index.php\/2020\/10\/29\/abkyw-seeks-clearance-of-all-block-points-on-pasighat-pangin-road-within-15-days\/","title":{"rendered":"ABKYW seeks clearance of all block points on Pasighat-Pangin road within 15 days"},"content":{"rendered":"<p style=\"text-align: justify;\"><strong><a href=\"https:\/\/arunachaltimes.in\/wp-content\/uploads\/2020\/10\/ABKYW-seeks-clearance-of-all-block-points-on-Pasighat-Pangin-road-within-15-days.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-140754 alignleft\" src=\"https:\/\/arunachaltimes.in\/wp-content\/uploads\/2020\/10\/ABKYW-seeks-clearance-of-all-block-points-on-Pasighat-Pangin-road-within-15-days.jpg\" alt=\"\" width=\"428\" height=\"215\" srcset=\"https:\/\/arunachaltimes.in\/wp-content\/uploads\/2020\/10\/ABKYW-seeks-clearance-of-all-block-points-on-Pasighat-Pangin-road-within-15-days.jpg 591w, https:\/\/arunachaltimes.in\/wp-content\/uploads\/2020\/10\/ABKYW-seeks-clearance-of-all-block-points-on-Pasighat-Pangin-road-within-15-days-300x151.jpg 300w\" sizes=\"auto, (max-width: 428px) 100vw, 428px\" \/><\/a>Staff reporter<\/strong><\/p>\n<p style=\"text-align: justify;\"><strong>ITANAGAR, OCT 28:<\/strong> The Adi Bane Kebang Youth Wing (ABKYW) has demanded that the state government and construction agency M\/s TK Engineering and Consortium Pvt Ltd clear all block points on National Highway-13 (Pasighat-Pangin road) within 15 days.<\/p>\n<p style=\"text-align: justify;\">Addressing a press conference here on Wednesday, the union also demanded that the construction agency &#8220;wind-up the project by December 2020, especially the Yembung bridge of Package-IV under NH-13, which has been lying incomplete since the project was initiated way back in 2010.&#8221;<\/p>\n<p style=\"text-align: justify;\">&#8220;The public of the Siang belt have been seeking restoration of NH-13 for improved connectivity and smooth flow of traffic,&#8221; ABKYW president Joluk Minung said, while claiming that &#8220;the blockage and debris on the roadside, caused by landslides that occurred in the past three years, are still lying unattended&#8221;.<\/p>\n<p style=\"text-align: justify;\">\u00a0&#8220;On 21 October, a memorandum was submitted to the chief secretary and highway chief engineer regarding the matter, but not a single block point has been cleared,&#8221; Minung claimed.<\/p>\n<p style=\"text-align: justify;\">The union also cautioned that it would resort to &#8220;a democratic movement&#8221; if the government and the constructing agencies fail to meet its demands within the given time period.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Staff reporter ITANAGAR, OCT 28: The Adi Bane Kebang Youth Wing (ABKYW) has demanded that the state government and construction agency M\/s TK Engineering and Consortium Pvt Ltd clear all block points on National Highway-13 (Pasighat-Pangin road) within 15 days. Addressing a press conference here on Wednesday, the union also demanded that the construction agency [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[],"class_list":{"0":"post-140748","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-state-news"},"_links":{"self":[{"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/posts\/140748","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/comments?post=140748"}],"version-history":[{"count":0,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/posts\/140748\/revisions"}],"wp:attachment":[{"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/media?parent=140748"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/categories?post=140748"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/tags?post=140748"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}