{"id":141925,"date":"2020-11-12T02:30:58","date_gmt":"2020-11-11T21:00:58","guid":{"rendered":"https:\/\/arunachaltimes.in\/?p=141925"},"modified":"2020-11-12T02:30:58","modified_gmt":"2020-11-11T21:00:58","slug":"restoration-of-ganga-jullang-road-begins","status":"publish","type":"post","link":"https:\/\/arunachaltimes.in\/index.php\/2020\/11\/12\/restoration-of-ganga-jullang-road-begins\/","title":{"rendered":"Restoration of Ganga- Jullang road begins"},"content":{"rendered":"<p style=\"text-align: justify;\"><strong><a href=\"https:\/\/arunachaltimes.in\/wp-content\/uploads\/2020\/11\/Restoration-of-Ganga-Jullang-road-begins.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-141937 alignleft\" src=\"https:\/\/arunachaltimes.in\/wp-content\/uploads\/2020\/11\/Restoration-of-Ganga-Jullang-road-begins.jpg\" alt=\"\" width=\"430\" height=\"322\" srcset=\"https:\/\/arunachaltimes.in\/wp-content\/uploads\/2020\/11\/Restoration-of-Ganga-Jullang-road-begins.jpg 591w, https:\/\/arunachaltimes.in\/wp-content\/uploads\/2020\/11\/Restoration-of-Ganga-Jullang-road-begins-300x225.jpg 300w, https:\/\/arunachaltimes.in\/wp-content\/uploads\/2020\/11\/Restoration-of-Ganga-Jullang-road-begins-560x420.jpg 560w, https:\/\/arunachaltimes.in\/wp-content\/uploads\/2020\/11\/Restoration-of-Ganga-Jullang-road-begins-80x60.jpg 80w, https:\/\/arunachaltimes.in\/wp-content\/uploads\/2020\/11\/Restoration-of-Ganga-Jullang-road-begins-265x198.jpg 265w\" sizes=\"auto, (max-width: 430px) 100vw, 430px\" \/><\/a>ITANAGAR, Nov 11:<\/strong> The Public Works Department (PWD) has begun work on restoring the Ganga to Jullang road near here.<\/p>\n<p style=\"text-align: justify;\">During the last monsoon, a culvert and around 100 metre of road was washed away, cutting-off the road connectivity between Ganga and Jullang.<\/p>\n<p style=\"text-align: justify;\">According to a PWD official, the structure has been designed by Chief Engineer SID &amp; P, Atop Lego, in collaboration with the Maccaferri India Group.<\/p>\n<p style=\"text-align: justify;\">&#8220;The department has tentatively set a target of January next year to complete the work provided the weather supports,&#8221; said the PWD official.<\/p>\n<p style=\"text-align: justify;\">Meanwhile, on Wednesday, the advisor to PWD, Phurpha Tsering visited the damaged site and took stock of the damage caused to the Itanagar-Jullang-Papu road.<\/p>\n<p style=\"text-align: justify;\">He was accompanied by Chief Engineer (Highway) Kuru Sera, EE CD-B Tarh Gongkap and his team.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>ITANAGAR, Nov 11: The Public Works Department (PWD) has begun work on restoring the Ganga to Jullang road near here. During the last monsoon, a culvert and around 100 metre of road was washed away, cutting-off the road connectivity between Ganga and Jullang. According to a PWD official, the structure has been designed by Chief [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[],"class_list":{"0":"post-141925","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-state-news"},"_links":{"self":[{"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/posts\/141925","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/comments?post=141925"}],"version-history":[{"count":0,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/posts\/141925\/revisions"}],"wp:attachment":[{"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/media?parent=141925"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/categories?post=141925"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/tags?post=141925"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}