{"id":166357,"date":"2021-07-15T02:37:22","date_gmt":"2021-07-14T21:07:22","guid":{"rendered":"https:\/\/arunachaltimes.in\/?p=166357"},"modified":"2021-07-15T02:37:22","modified_gmt":"2021-07-14T21:07:22","slug":"dc-reviews-bridge-restoration-work-arrangements","status":"publish","type":"post","link":"https:\/\/arunachaltimes.in\/index.php\/2021\/07\/15\/dc-reviews-bridge-restoration-work-arrangements\/","title":{"rendered":"DC reviews bridge restoration work arrangements"},"content":{"rendered":"<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\"><strong>RAGA, 14 Jul:<\/strong> Kamle Deputy Commissioner Adong Pertin on Wednesday reviewed the status of the material arrangements for the restoration of the Bailey bridge in Tamen.<\/p>\n<p style=\"text-align: justify;\">The executive engineer of Ziro (Lower Subansiri)-based highway division informed that advance payment for materials have already been made and the materials are expected to reach Tamen by 20 July, along with engineers and technicians.<\/p>\n<p style=\"text-align: justify;\">On 26 June, during a meeting with officers of the highway department, representatives of Kolkata (WB)-based M\/s Bridge and Roof Company (India) Ltd (BRCIL), and local leaders in Tamen, the BRCIL was given six weeks for procuring<\/p>\n<p style=\"text-align: justify;\">materials and restoring the Bailey bridge.<\/p>\n<p style=\"text-align: justify;\">The DC meanwhile constituted a district level inquiry committee, headed by the Raga ADC, to inquire into the causes of the damages to the bridge.<\/p>\n<p style=\"text-align: justify;\">As per the committee&#8217;s preliminary report, the bridge should have been designed for 40-45 tonnes capacity in the initial stage, taking into consideration the TAH construction works. It said that &#8220;crossing of an overloaded dumper truck over the bridge by the driver Pranob Jyoti Deori was the main cause of the damage to the Bailey suspension bridge.&#8221;<\/p>\n<p style=\"text-align: justify;\">The DC directed the committee chairman to submit the full report at the earliest. (DIPRO)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>RAGA, 14 Jul: Kamle Deputy Commissioner Adong Pertin on Wednesday reviewed the status of the material arrangements for the restoration of the Bailey bridge in Tamen. The executive engineer of Ziro (Lower Subansiri)-based highway division informed that advance payment for materials have already been made and the materials are expected to reach Tamen by 20 [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[],"class_list":{"0":"post-166357","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-state-news"},"_links":{"self":[{"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/posts\/166357","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/comments?post=166357"}],"version-history":[{"count":0,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/posts\/166357\/revisions"}],"wp:attachment":[{"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/media?parent=166357"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/categories?post=166357"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/tags?post=166357"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}