{"id":191361,"date":"2022-05-21T01:23:31","date_gmt":"2022-05-20T19:53:31","guid":{"rendered":"https:\/\/arunachaltimes.in\/?p=191361"},"modified":"2022-05-21T01:23:31","modified_gmt":"2022-05-20T19:53:31","slug":"bro-completes-excavation-of-nechiphu-tunnel","status":"publish","type":"post","link":"https:\/\/arunachaltimes.in\/index.php\/2022\/05\/21\/bro-completes-excavation-of-nechiphu-tunnel\/","title":{"rendered":"BRO completes excavation of Nechiphu tunnel"},"content":{"rendered":"<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\"><strong>ITANAGAR, 20 May<\/strong>: Project Vartak of the Border Roads Organisation (BRO) completed the excavation of the Nechiphu tunnel in West Kameng district on Friday, Defence PRO Lt Col AS Walia informed in a release.<\/p>\n<p style=\"text-align: justify;\">Border DG Lt Gen Rajeev Chaudhry initiated the blast through videoconference.<\/p>\n<p style=\"text-align: justify;\">&#8220;Project Vartak in the last 18 months has completed the excavation of Sela and Nechiphu tunnels located on BCT road connecting Balipara to Tawang,&#8221; the release stated.<\/p>\n<p style=\"text-align: justify;\">Project Vartak Chief Engineer Brig Harish Kumar informed that the D-shaped 500-metre tunnel, located at an altitude of 5,700 feet, &#8220;will accommodate two-way traffic and will be equipped with modern lighting and safety facilities.&#8221;<\/p>\n<p style=\"text-align: justify;\">Once in service, the Nechiphu tunnel will not only provide safe all-weather passage but will also cut short the travel time by 30 minutes and reduce the road distance by 7 kms.<\/p>\n<p style=\"text-align: justify;\">&#8220;This environment-friendly construction and reduction in distance will also help reduce the carbon footprint of the roads in the area,&#8221; the release said, adding that the tunnel will be equipped with &#8220;a state-of-the-art electro-mechanical system, including firefighting devices, auto illumination system and SCADA-controlled monitoring systems.&#8221;<\/p>\n<p style=\"text-align: justify;\">&#8220;This is one of the many tunnels conceived by the BRO along the border areas to improve existing road geometrics, avoid foggy areas, circumvent slide-prone areas and reduce black spots on the roads to offer greater safety and all-weather connectivity to the military and civil traffic movement,&#8221; the PRO said.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>ITANAGAR, 20 May: Project Vartak of the Border Roads Organisation (BRO) completed the excavation of the Nechiphu tunnel in West Kameng district on Friday, Defence PRO Lt Col AS Walia informed in a release. Border DG Lt Gen Rajeev Chaudhry initiated the blast through videoconference. &#8220;Project Vartak in the last 18 months has completed the [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":191371,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[],"class_list":{"0":"post-191361","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-state-news"},"_links":{"self":[{"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/posts\/191361","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/comments?post=191361"}],"version-history":[{"count":0,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/posts\/191361\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/media\/191371"}],"wp:attachment":[{"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/media?parent=191361"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/categories?post=191361"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/tags?post=191361"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}