{"id":194943,"date":"2022-07-08T02:03:53","date_gmt":"2022-07-07T20:33:53","guid":{"rendered":"https:\/\/arunachaltimes.in\/?p=194943"},"modified":"2022-07-08T02:03:53","modified_gmt":"2022-07-07T20:33:53","slug":"renovation-work-on-stretch-of-nh-415-starts","status":"publish","type":"post","link":"https:\/\/arunachaltimes.in\/index.php\/2022\/07\/08\/renovation-work-on-stretch-of-nh-415-starts\/","title":{"rendered":"Renovation work on stretch of NH 415 starts"},"content":{"rendered":"<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\"><strong>Staff Reporter<\/strong><\/p>\n<p style=\"text-align: justify;\"><strong>ITANAGAR 7 Jul:<\/strong> Renovation work on the stretch of National Highway (NH) 415 from the Jollang trijunction to Nirjuli under Package B started from Wednesday night.<\/p>\n<p style=\"text-align: justify;\">&#8220;This stretch of the road will be repaired by filling up the potholes within 10 days, provided the weather condition is good,&#8221; informed TK Engineering project manager Pranjol Hatimota.<\/p>\n<p style=\"text-align: justify;\">He informed that the road up to the Yupia trijunction has been repaired and carpeted &#8220;and tonight the grading work will be done from the Yupia trijunction and, accordingly, the carpeting work will be started by Friday.&#8221;<\/p>\n<p style=\"text-align: justify;\">The official informed that the repair work will involve expenditure of Rs 1.7 crore.<\/p>\n<p style=\"text-align: justify;\">The construction work under Package B (Papu Nallah to Nirjuli) had started in December last year and is expected to be completed by 2024.<\/p>\n<p style=\"text-align: justify;\">Officials of the construction agency said that &#8220;there shouldn&#8217;t be any repair work; rather, proper road should be built up.&#8221;<\/p>\n<p style=\"text-align: justify;\">ICR DC Talo Potom informed that the road construction is underway, that a few culverts are being constructed in the Lekhi area, and that the broadening of the road has started.<\/p>\n<p style=\"text-align: justify;\">The DC informed that &#8220;the current road work in Yupia trijunction is just a repair work due to public outcry. The main work of the four-lane has been started, wherein the two-lane road which is already completed will be free for traffic movement, so that the remaining two-lane in the other stretch can be completed.&#8221;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Staff Reporter ITANAGAR 7 Jul: Renovation work on the stretch of National Highway (NH) 415 from the Jollang trijunction to Nirjuli under Package B started from Wednesday night. &#8220;This stretch of the road will be repaired by filling up the potholes within 10 days, provided the weather condition is good,&#8221; informed TK Engineering project manager [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":194956,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[],"class_list":{"0":"post-194943","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-state-news"},"_links":{"self":[{"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/posts\/194943","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/comments?post=194943"}],"version-history":[{"count":0,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/posts\/194943\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/media\/194956"}],"wp:attachment":[{"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/media?parent=194943"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/categories?post=194943"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/tags?post=194943"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}