{"id":199552,"date":"2022-09-04T02:07:18","date_gmt":"2022-09-03T20:37:18","guid":{"rendered":"https:\/\/arunachaltimes.in\/?p=199552"},"modified":"2022-09-04T02:07:18","modified_gmt":"2022-09-03T20:37:18","slug":"power-secy-on-tour-to-inspect-works-progress","status":"publish","type":"post","link":"https:\/\/arunachaltimes.in\/index.php\/2022\/09\/04\/power-secy-on-tour-to-inspect-works-progress\/","title":{"rendered":"Power secy on tour to inspect works\u2019 progress"},"content":{"rendered":"<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\"><strong>LEMMI, 3 Sep:<\/strong> Power Secretary Ajay Kumar Bisht arrived here in Pakke-Kessang district on Saturday as part of his two-day tour of Papum Pare, Pakke-Kessang, East Kameng and West Kameng districts to inspect the work achievements under the &#8216;comprehensive schemes for strengthening of power and distribution system in Arunachal Pradesh and Sikkim&#8217;.<\/p>\n<p style=\"text-align: justify;\">The secretary visited the 132 kv and the 33\/11 kv substations under construction in Sagalee, and the 33\/11 kv substation in Leporiang, before arriving here.<\/p>\n<p style=\"text-align: justify;\">Due to heavy rainfall, Bisht could not visit the construction site of the 133 kv and the 33\/11 kv substations in Lemmi, but held a meeting with representatives of the PGCIL, which is the construction agency of the substation in Lemmi.<\/p>\n<p style=\"text-align: justify;\">Pakke-Kessang ZPM Sunil Nabam and PGCIL Senior Manager (Seppa) Dharambir Kumar apprised the secretary of the physical achievements made so far on the 132 kv and the 33\/11 kv substations in Lemmi.<\/p>\n<p style=\"text-align: justify;\">Bisht was accompanied by, among others, Power CE (WZ) Bar Takum, CE (TM&amp;P) G Lingi, SE (E) Diyum Taipodia, Subu Circle SE (E) Hage Mima, and PGDIL Executive Director RS Gupta. (DIPRO)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>LEMMI, 3 Sep: Power Secretary Ajay Kumar Bisht arrived here in Pakke-Kessang district on Saturday as part of his two-day tour of Papum Pare, Pakke-Kessang, East Kameng and West Kameng districts to inspect the work achievements under the &#8216;comprehensive schemes for strengthening of power and distribution system in Arunachal Pradesh and Sikkim&#8217;. The secretary visited [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":199562,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[],"class_list":{"0":"post-199552","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-state-news"},"_links":{"self":[{"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/posts\/199552","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/comments?post=199552"}],"version-history":[{"count":0,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/posts\/199552\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/media\/199562"}],"wp:attachment":[{"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/media?parent=199552"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/categories?post=199552"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/tags?post=199552"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}