{"id":248317,"date":"2024-09-11T01:09:16","date_gmt":"2024-09-10T19:39:16","guid":{"rendered":"https:\/\/arunachaltimes.in\/?p=248317"},"modified":"2024-09-11T01:09:16","modified_gmt":"2024-09-10T19:39:16","slug":"construction-of-prefabricated-youth-activity-centre-underway-in-miao","status":"publish","type":"post","link":"https:\/\/arunachaltimes.in\/index.php\/2024\/09\/11\/construction-of-prefabricated-youth-activity-centre-underway-in-miao\/","title":{"rendered":"Construction of prefabricated youth activity centre underway in Miao"},"content":{"rendered":"<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\"><strong>[ Pisi Zauing ]<\/strong><\/p>\n<p style=\"text-align: justify;\"><strong>MIAO, 10 Sep:<\/strong> The construction of a prefabricated Youth Activity and Development Centre here in Changlang district is fast accelerating.<\/p>\n<p style=\"text-align: justify;\">With a project cost of Rs 5 crores, the first-of-its-kind public asset will have prefabricated structure equipped with facilities like gallery, stage, badminton court, etc.<\/p>\n<p style=\"text-align: justify;\">The target set for completion of the project is March 2025. The old community hall was dismantled to implement the huge project.<\/p>\n<p style=\"text-align: justify;\">While commending local MLA Kamlung Mossang for sanctioning Rs 85 crores for the construction of the centre, Miao Singpho Ramma Hpung president Gamseng Singpho appealed to the executing agency &#8211; the urban development &amp; housing (UD&amp;H) department, Jairampur division &#8211; not to compromise with the quality and make sure that the project is completed within the stipulated period of March end.<\/p>\n<p style=\"text-align: justify;\">Talking to this correspondent, UD&amp;H Assistant Engineer Michi Paying assured to live up to the expectations of the general public and do everything to complete and dedicate the project on time.<\/p>\n<p style=\"text-align: justify;\">With 90 feet in breadth, 135 feet in length and 35 feet in height, the centre will have the capacity to accommodate more than 1,000 persons at a time. The facility will be well-equipped with standard sound systems, air conditioning, lighting systems, and modern toilets. The centre will be surrounded with ornamental trees to add a new dimension to the beauty of Miao.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ Pisi Zauing ] MIAO, 10 Sep: The construction of a prefabricated Youth Activity and Development Centre here in Changlang district is fast accelerating. With a project cost of Rs 5 crores, the first-of-its-kind public asset will have prefabricated structure equipped with facilities like gallery, stage, badminton court, etc. The target set for completion of [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":248330,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[],"class_list":{"0":"post-248317","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-state-news"},"_links":{"self":[{"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/posts\/248317","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/comments?post=248317"}],"version-history":[{"count":0,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/posts\/248317\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/media\/248330"}],"wp:attachment":[{"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/media?parent=248317"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/categories?post=248317"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/tags?post=248317"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}