{"id":250546,"date":"2024-10-17T01:47:09","date_gmt":"2024-10-16T20:17:09","guid":{"rendered":"https:\/\/arunachaltimes.in\/?p=250546"},"modified":"2024-10-17T01:47:09","modified_gmt":"2024-10-16T20:17:09","slug":"ete-takes-stock-of-progress-of-viaducts-on-nh-13","status":"publish","type":"post","link":"https:\/\/arunachaltimes.in\/index.php\/2024\/10\/17\/ete-takes-stock-of-progress-of-viaducts-on-nh-13\/","title":{"rendered":"Ete takes stock of progress of viaducts on NH-13"},"content":{"rendered":"<p style=\"text-align: justify;\">\n<p style=\"text-align: justify;\"><strong>AALO, 16 Oct:<\/strong> MLA Topin Ete along with West Siang deputy commissioner Hage Mamu on Wednesday visited the construction sites of the three viaducts between Higi Bagra and Doji village on Potin-Pangin section of the Trans-Arunachal Highway (NH-13) to take stock of the progress of the work. This was the duo&#8217;s second inspection of the project since August this year.<\/p>\n<p style=\"text-align: justify;\">The MLA expressed satisfaction with the pace at which the construction work was<\/p>\n<p style=\"text-align: justify;\">progressing, and hoped that the project would be completed on time.<\/p>\n<p style=\"text-align: justify;\">The DC advised the site engineers of the company and the field officers of highway division to keep pace with their works and complete it on time ensuring quality.<\/p>\n<p style=\"text-align: justify;\">Basar highway division executive engineer Nyumli Sora said that efforts are being made to complete the work before the set date.<\/p>\n<p style=\"text-align: justify;\">In August, the field engineers of the contractor M\/s Kaushal Sharma and officers of the PWD (highway) had assured the MLA and the DC that the 40-metre span viaduct will be completed by November this year.<\/p>\n<p style=\"text-align: justify;\">The MLA and the DC were accompanied by circle officer Eken Bam. (DIPRO)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>AALO, 16 Oct: MLA Topin Ete along with West Siang deputy commissioner Hage Mamu on Wednesday visited the construction sites of the three viaducts between Higi Bagra and Doji village on Potin-Pangin section of the Trans-Arunachal Highway (NH-13) to take stock of the progress of the work. This was the duo&#8217;s second inspection of the [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":250558,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[],"class_list":{"0":"post-250546","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-state-news"},"_links":{"self":[{"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/posts\/250546","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/comments?post=250546"}],"version-history":[{"count":0,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/posts\/250546\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/media\/250558"}],"wp:attachment":[{"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/media?parent=250546"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/categories?post=250546"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/tags?post=250546"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}