{"id":69348,"date":"2019-06-12T02:36:44","date_gmt":"2019-06-11T21:06:44","guid":{"rendered":"https:\/\/arunachaltimes.in\/?p=69348"},"modified":"2019-06-12T02:36:44","modified_gmt":"2019-06-11T21:06:44","slug":"cm-directs-pwd-to-restore-tamin-bridge","status":"publish","type":"post","link":"https:\/\/arunachaltimes.in\/index.php\/2019\/06\/12\/cm-directs-pwd-to-restore-tamin-bridge\/","title":{"rendered":"CM directs PWD to restore Tamin bridge"},"content":{"rendered":"<p style=\"text-align: justify;\"><strong>ITANAGAR, Jun 11<\/strong>: Chief Minister Pema Khandu has directed the PWD commissioner to restore the Tamin bridge in Kamle district, which partially collapsed on Monday, on a war footing.<br \/>\nThe bridge connects Lower Subansiri with Kamle and Upper Subansiri districts.<br \/>\nAccording to the PWD highways chief engineer&#8217;s report, the district administration had already put up signboards on both sides of the bridge, &#8220;clearly stating permissible load capacity of 9 mts for heavy vehicles, inclusive of vehicle weight.&#8221;<br \/>\nHowever, the CE said, a vehicle which weighed more than the permissible limit had crossed over the bridge, leading to the damage.<br \/>\nThe CE informed that the department has started the restoration work, and that the movement of light vehicles on the bridge would be possible by 3 pm on Tuesday.<br \/>\nEarlier, during a review meeting of the PWD, the CM had ordered immediate construction of a new bridge, the tender for which had already been floated by the department on 7 June.<br \/>\nThe PWD commissioner had informed the CM that the process was being expedited, and that everything would be &#8220;on track within a few months.&#8221; (CMO)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>ITANAGAR, Jun 11: Chief Minister Pema Khandu has directed the PWD commissioner to restore the Tamin bridge in Kamle district, which partially collapsed on Monday, on a war footing. The bridge connects Lower Subansiri with Kamle and Upper Subansiri districts. According to the PWD highways chief engineer&#8217;s report, the district administration had already put up [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[],"class_list":{"0":"post-69348","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-state-news"},"_links":{"self":[{"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/posts\/69348","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/comments?post=69348"}],"version-history":[{"count":0,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/posts\/69348\/revisions"}],"wp:attachment":[{"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/media?parent=69348"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/categories?post=69348"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/tags?post=69348"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}