{"id":74218,"date":"2019-08-01T01:26:06","date_gmt":"2019-07-31T19:56:06","guid":{"rendered":"https:\/\/arunachaltimes.in\/?p=74218"},"modified":"2019-08-01T01:26:06","modified_gmt":"2019-07-31T19:56:06","slug":"aalo-pasighat-power-transmission-line-restored","status":"publish","type":"post","link":"https:\/\/arunachaltimes.in\/index.php\/2019\/08\/01\/aalo-pasighat-power-transmission-line-restored\/","title":{"rendered":"Aalo- Pasighat power transmission line restored"},"content":{"rendered":"<p style=\"text-align: justify;\"><strong>BABUK, Jul 31:<\/strong> The damaged power transmission tower number 43 of the 132 KV Aalo-Pasighat transmission line, located in Babuk village in East Siang district was restored at around 8.30 pm on Wednesday in a sort of record time with dedicated service of the staff of power department, informed Power (Monitoring) Superintending Engineer TK Tara.<br \/>\nThe tower had collapsed recently resulting in disruption of power supply to Pasighat and all the downstream areas up to Namsai.<br \/>\n&#8220;Accordingly, normal grid power supply to Pasighat was restored at about 9.35 pm and all the downstream loads from EHV sub-stations of Roing, Tezu and Namsai were also restored gradually with the grid supplies through the Pasighat-Roing-Tezu-Namsai 132 KV transmission line at around 11.15 pm after clearance from the NERLDC. Now system is totally restored,&#8221; the SE informed.<br \/>\nMeanwhile, Deputy Chief Minister Chowna Mein appreciated Tara and his team for restoration of the power transmission line in record time.<br \/>\n&#8220;Such committed and dedicated officers are an asset to the department. I am sure that such enthusiasm and zeal to work in public interest will improve the power scenario of the state and take the power department of Arunachal a long way,&#8221; Mein said.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>BABUK, Jul 31: The damaged power transmission tower number 43 of the 132 KV Aalo-Pasighat transmission line, located in Babuk village in East Siang district was restored at around 8.30 pm on Wednesday in a sort of record time with dedicated service of the staff of power department, informed Power (Monitoring) Superintending Engineer TK Tara. [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[],"class_list":{"0":"post-74218","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-state-news"},"_links":{"self":[{"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/posts\/74218","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/comments?post=74218"}],"version-history":[{"count":0,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/posts\/74218\/revisions"}],"wp:attachment":[{"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/media?parent=74218"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/categories?post=74218"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/tags?post=74218"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}