{"id":83585,"date":"2019-11-02T01:07:36","date_gmt":"2019-11-01T19:37:36","guid":{"rendered":"https:\/\/arunachaltimes.in\/?p=83585"},"modified":"2019-11-02T01:07:36","modified_gmt":"2019-11-01T19:37:36","slug":"nh-415-stretch-carpeted-with-plastic-on-trial-basis","status":"publish","type":"post","link":"https:\/\/arunachaltimes.in\/index.php\/2019\/11\/02\/nh-415-stretch-carpeted-with-plastic-on-trial-basis\/","title":{"rendered":"NH 415 stretch carpeted with plastic on trial basis"},"content":{"rendered":"<p style=\"text-align: justify;\"><strong>NAHARLAGUN, Nov 1:<\/strong> A stretch of National Highway 415 in Papu Nallah here was carpeted with bituminous concrete mixed with plastic on Friday morning, on a trial basis.<br \/>\nNirjuli PWD Highway Division EE, Nani Tath, said the carpeting work was carried out with the help of TK Engineering Consortium, as part of the Swachhta Hi Seva programme.<br \/>\nThe EE claimed that &#8220;officers and officials of the highway division collected roadside plastic waste,&#8221; which was then reused for road work, particularly on the wearing course, &#8220;to improve marshal stability and fatigue life, and to improve longevity and pavement performance.&#8221;<br \/>\nHe said formation-cutting and other activities are underway on a war footing, and that the officers of the highway division are monitoring the work regularly.<br \/>\nTath said there are still &#8220;around 34 hindrances, which include complete shifting of electric poles, shifting of water supply pipelines, shifting of BSNL cables and lines, administrative works, and a few encroachments.&#8221;<br \/>\nThe EE requested the residents of the capital complex to bear with the difficulties faced by them due to the construction of the four-lane highway, and gave assurance that &#8220;some visible changes will be seen by March 2020 and shall be imposed on contractors to complete the project in time as per the agreement scheduled.&#8221;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>NAHARLAGUN, Nov 1: A stretch of National Highway 415 in Papu Nallah here was carpeted with bituminous concrete mixed with plastic on Friday morning, on a trial basis. Nirjuli PWD Highway Division EE, Nani Tath, said the carpeting work was carried out with the help of TK Engineering Consortium, as part of the Swachhta Hi [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":83610,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[],"class_list":{"0":"post-83585","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-state-news"},"_links":{"self":[{"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/posts\/83585","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/comments?post=83585"}],"version-history":[{"count":0,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/posts\/83585\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/media\/83610"}],"wp:attachment":[{"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/media?parent=83585"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/categories?post=83585"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/arunachaltimes.in\/index.php\/wp-json\/wp\/v2\/tags?post=83585"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}