SAGALEE, Dec 5: The Mengio Circle Contractors Association in a memorandum on Tuesday appealed to the PWD Executive Engineer here to give specific directive to the site engineers to follow the original DPR for the construction of the road from Pan to the Panyor bridge point.
The memorandum said that any alteration to the alignment at the present time would create immense problems.