BOLENG, 7 Feb: Siang DC Atul Tayeng, along with engineers, land management staffers and consultants from the MoRTH inspected the road from the Sanggam trijunction to Gabung stream (Package 9) in the Potin-Pangin sector of NH 13 on Monday.
On being directed by the DC to expedite the work, TTC Infra India Pvt Ltd director Pobin Padu assured to speed up the construction activities from March and complete the project by March 2023.
The DC also inspected the proposed Kaying-Tato road from km 11.350 to km 19.950, and from km 28.600 to km 26.600. He asked the Kaying EAC to expedite survey works “for compensation and assessment of the road,” so that all formalities can be completed on time. (DIPRO)